Sunspeed delivered a large-scale deployment programme in Frankfurt to support a European infrastructure expansion.

Background

A global life sciences organisation was expanding its network infrastructure across two data centre halls in Frankfurt as part of a wider programme to support increasing demand across its European operations.

Delivery responsibility sat with a specialist infrastructure services partner, with Sunspeed engaged to manage and execute the physical deployment layer within the data centre environment. The objective was to ensure a complex high availability network build was delivered in line with design intent, with controlled execution across multiple phases and a smooth transition into service.

106 x

devices deployed. 

The CHALLENGE

The programme required the coordinated deployment of a large volume of enterprise networking and security infrastructure across two facilities, alongside extensive structured cabling works.

While the design and architecture had already been defined, successful delivery depended on tight control of execution in a high density environment where sequencing, accuracy and coordination directly impacted commissioning outcomes.

Key delivery requirements included:

  • Deployment of more than 100 enterprise network and security devices across both data halls
  • Installation of structured fibre and copper cabling based on customer provided design documentation
  • Strict adherence to rack elevations, port mapping and installation standards across multiple vendors
  • Full end to end testing of cabling to support validation and acceptance
  • Coordination of multiple installation phases aligned to wider programme milestones

The core challenge was ensuring that physical implementation remained fully aligned to design intent while maintaining delivery momentum and reducing risk during commissioning and handover.

300x

connections patched.

THE SOLUTIONS

unspeed acted as the on site delivery lead, managing the end to end physical deployment across both Frankfurt facilities on behalf of the infrastructure services partner.

Working directly from customer supplied designs and rack layouts, Sunspeed planned, sequenced and controlled all installation activity across multiple phases. This included the deployment of 107 network and security devices spanning switching, routing, firewall, load balancing and management platforms from Cisco, Palo Alto and F5.

Alongside hardware deployment, Sunspeed managed the structured cabling programme across both data halls, overseeing the installation of approximately 300 fibre and copper connections and associated cable management systems. This ensured consistent routing standards, clean installation practices and long term serviceability across the environment.

All cabling was tested following installation, with results documented and handed over to support commissioning and acceptance. Sunspeed also coordinated on site activity during integration and go live preparation, ensuring alignment between installation progress and wider programme requirements.

OUTCOMES

By taking ownership of on site delivery, Sunspeed enabled the infrastructure services partner and end customer to transition from design to a fully built, high availability ready infrastructure environment with controlled execution across both sites.

For the end customer, the programme delivered a production ready network platform capable of supporting critical applications across European operations, with a fully installed and validated infrastructure base to support commissioning and service activation.

For the infrastructure services partner, Sunspeed provided delivery control within the data centre environment, reducing the need to manage fragmented on site activity. This improved coordination efficiency, reduced execution risk and supported consistent delivery across a multi phase international programme.

Overall, the engagement delivered:

  • Controlled end to end physical deployment of a multi vendor network infrastructure across two Frankfurt data halls
  • Sequenced installation approach aligned to programme milestones and commissioning requirements
  • Fully tested structured cabling environment supporting validation and service activation
  • Consistent build quality aligned to design intent across all devices and connections
  • Reduced delivery risk through on site execution management and coordinated installation control

The result was a disciplined, production ready infrastructure build delivered through a single controlled delivery layer within a complex international programme.

    DISCOVER HOW WE CAN SUPPORT YOU

    Sunspeed has been providing IT services for over 30 years. We are industry leaders in transformation projects such as Data Centre Relocations, and provide a comprehensive package of services to deliver you control of your physical IT infrastructure. Reach out today to discover how we can support you:

    "The client also stated that the install, device positioning and implementation was the best he has ever seen put out in production from rolling out their solutions"

    Sam
    Business Development Manager

    "Mission focussed and attacked the task professionally, great communication between the guys (and me) when anything needed to be checked. All eventualities were accounted for."

    Laura
    Project Manager

    "The entire Sunspeed team demonstrated professionalism throughout and the standards achieved were high, exceeding my expectations, which were by no means low!"

    Paul
    IT Project Manager

    "Thank you once again for your help, collaboration, and support throughout the entire project, while ensuring no impact to our stakeholders."

    Martin
    IT Project Manager

    "The office clearance and Data Centre recovery went like clockwork. All work was carried out in an efficient and professional manner and no problems, great!"

    Andrew
    IT Project Manager

    "Hi Sunspeed just wanted to say all delivered yesterday safe and sound. And big thanks to the team you guys are rock stars..."

    Jackie
    Solutions Centre Manager