Background
A leading UK financial services organisation was undertaking a strategic migration of its IT infrastructure into a new London colocation facility. Working through a global managed services provider, the customer required a delivery partner capable of preparing the target environment and executing the migration with minimal operational disruption.
The project involved relocating up to 60 production IT devices while simultaneously introducing new infrastructure into the destination environment. Success depended on creating a fully prepared target state before the migration window, ensuring every device, cable and connection was documented, validated and ready for cutover.
With a tightly controlled out of hours migration schedule and business critical services at stake, the customer needed complete confidence in both the engineering and logistics elements of the project.
The CHALLENGE
Sunspeed delivered a fully managed programme combining infrastructure deployment, migration planning and specialist relocation services.
The engagement began with a detailed audit of the existing environment, including hardware inventories, cable tracing exercises and migration sequencing. This information was used to develop the rack elevations, patching schedules and implementation plans that would form the foundation of the migration.
Ahead of the move, Sunspeed engineers built and installed a new structured cabling environment across four destination cabinets. The installation included Cat6 and OM4 fibre infrastructure, designed to support both the immediate migration requirements and the customer’s future growth plans.
Key project activities included:
- Hardware auditing and migration planning
- End to end cable tracing and patch schedule creation
- Design and installation of new copper and fibre cabling infrastructure
- Testing and labelling of all cabling to industry standards
- Secure de-racking, transportation and re-racking of production equipment
- Post migration support and infrastructure validation
By completing the cabling and preparation work in advance of the migration event, Sunspeed reduced implementation risk and enabled a smoother transition during the live move window.
OUTCOMES
The project successfully transitioned the customer’s infrastructure into its new colocation environment, delivering a well organised and fully documented platform ready to support future operations.
Through careful planning and phased preparation, Sunspeed helped minimise migration risk while maintaining control and visibility throughout the project lifecycle. The combination of infrastructure deployment, relocation logistics and technical engineering within a single service model simplified project management and ensured accountability from planning through to handover.
Project highlights included:
- Relocation of up to 60 production IT assets
- Installation of new Cat6 and OM4 cabling infrastructure across four cabinets
- Secure transportation supported by documented chain of custody procedures
- Comprehensive rack, patching and migration documentation
- Extended post migration support for customer validation and service restoration
The result was a seamless infrastructure transition that provided the customer with a modern, scalable environment while reducing the complexity typically associated with large scale physical migration projects.
DISCOVER HOW WE CAN SUPPORT YOU
Sunspeed has been providing IT services for over 30 years. We are industry leaders in transformation projects such as Data Centre Relocations, and provide a comprehensive package of services to deliver you control of your physical IT infrastructure. Reach out today to discover how we can support you: