Overview
Sunspeed was engaged by a managed services provider to install 200 access points across some of the UK’s largest theatres. This project included a full Wi-Fi survey, structured cabling installation, and AP mounting. Given the historical nature of these Grade I & II listed buildings, additional planning and design considerations were required to ensure minimal disruption while optimising cabling routes. At one site, we conducted an active Wireless RF Assessment to evaluate existing RF conditions, identify potential wireless network issues, and recommend remediation strategies. Using Ekahau Site Survey software, we created a 3D model of the building to map wireless coverage accurately. An Ekahau Sidekick was deployed to assess 802.11 and RF conditions, with a laser measurement tool used for precise scaling. A complete hybrid survey was performed to capture the as-is state of the wireless network, ensuring optimal AP placement and performance.

THE PROJECT
AP-on-a-Stick
Network Design
AP Installation
Structured Cabling