Client Case Studies

Mira were relocating their entire CAD (Computer-Aided Design) operation from Milan to Paris. It was imperative that the whole operation was completed within a 24 hour period

Read more...

Sunspeed were given less than 24 hours to remove a large amount of high-end IT equipment, place into secure, temporary storage and then relocate to a new hosting facility.

Read more...

share_prices_graphA large Data Centre migration involving 800 servers - approximately 50% of the investment corporations' equipment and, once again, the work had to be carried out during the weekends.

Read more...

standard_chartered_bankThe bank had a requirement to migrate approximately 1200 high-end Servers, PC's and computer racks from two central London locations to a computer hosting centre in West London and Sunspeed were invited to quote for the transportation section

Read more...

time_critical_server_relocationTo achieve the migration of approximately 750 Servers from a location in the South of England to new premises in Wakefield, Yorkshire.

Read more...

west_sussex_county_council_logoThe Council had a requirement to migrate the entire contents of their data centre, approximately one mile, to their brand new centre at Chichester. Although a very short distance, the equipment numbered hundreds of Servers and peripheral equipment.

Read more...

news-room-with-a-wall-of-tv-screensTo relocate the entire Data centre from two East London locations to a new purpose-built centre less than three miles away. A variety of IT equipment including Servers, Populated Racks, Tape Libraries and Cabling and all within a very tight schedule.

Read more...